by everscreen | Aug 12, 2022 | News
Capacitor test station The test equipment is used for the production-accompanying testing of capacitors in the range of 1 – 1500 µ F, the maximum test voltage is 15 kV, the smallest step size is 10 v, the respective technical test requirements are read...
by everscreen | Aug 11, 2022 | News
Major project at the new Düsseldorf University of Applied Sciences Scope of services: The delivery of an EMC shielding cabin / absorber chamber with the dimensions: 15.3 x 5.4 x 4.8 (LxWxH). and a high-voltage hall with the dimensions: 12.8 x 10.8 x 8.3...
by everscreen | Aug 6, 2022 | News
High-voltage breakdown test stand The high-voltage breakdown test stand is used for AC and DC voltage testing up to 50kV according to DIN EN 60243/ASTM 149. It enables temperature testing of insulating media up to 250°. Optionally, the test stand was also...
by everscreen | Aug 5, 2022 | News
Expansion of the production capacities In order to be able to cover the increased requirements for the production of shielded rooms (size up to 24x20x18m), H+H carried out an expansion of its mechanical manufacturing capabilities in 2014. With the new hall, it...